Monday, 27 May 2013



First set up

All the parts have been cut and all the tubes have been cut and drilled . After getting some longer bolts from B&Q I could now fit the whole thing together for the first time . Not wanting to risk the whole thing falling apart I only tested it with 4 of the branches attached and not knowing how big it was going to be I did it in the park . Reasonably pleased with the result , but the reality of what I've made is starting to look me in the face . I did get some inquiries about what I was doing while setting all this up. 













No comments:

Post a Comment